Core Ontology for Petroleum Installations · INF-UFRGS-Ontologies · CNPq INF-UFRGS-ENERGIA inf.ufrgs.br/ontologies/copi dee69df

Subsea wellhead and X-mas trees

ISO 14224 Equipment — Well completion

ID: equip_XT  |  URI: https://www.iso.org/standard/64076.html

No definition available.

Properties / Attributes (25)
Name Data Type Unit / Valid values Required Definition
Well identification number — Number or name Required Operator description
Install/retrieve guide — Guideline, guideline-less Required Guideline/guideline-less, diver-as-
Well type — Production, injection Required Production, injection
Protection type — Trawl-catching, trawl-deflecting, none Required Over-trawlable, trawl-catching, etc.
Water depth — Metres Required
Design pressure — Pascal (bar) Required Pressure rating of wellhead and
Artificial lift well — Gas lift, ESP, PCP, none Required X-mas tree
Control principle — — Optional Defines the control principle for
Piggable — Yes/no Optional Specify if piggable or not
Size of tree — Metres, kilograms Optional Dimensions and mass
Mudline suspension system — Yes/no Optional Define whether a mudline suspension
Multilateral well — — Optional Define
Well flow rate — Specify Required Representative well flow rate (production or injection)
Fluid produced/injected — Oil, gas, condensate, injection water, oil and Required Main fluid only: oil, gas, condensate,
Fluid corrosiveness — Neutral, sweet, sour Required Classify as shown in the footnote
Fluid erosiveness — Benign, clean, moderate, severe, unknown Required Erosiveness of the well fluid
Valve application — Annulus master (AMV), Annulus swab Required X-mas tree valve function
Valve design class — Production swab, Production wing (PWV), Required Type of X-mas tree valve design
Valve actuation — Hydraulic, Electrical, Manual Optional Classify
Asphaltenes — Yes/no Optional Specify
Scale formation — Yes/no Optional Specify
Wax formation — Yes/no Optional Specify
Hydrate formation Specify Yes/no Low — — Optional
Sand production Specify Yes/no Low — — Optional
Failure modes
16 failure modes — click to expand
DOP Delayed operation ELP External leakage - process medium ELU External leakage - utility medium FCO Failure to connect FTC Failure to close on demand FTD Failure to disconnect FTL Failure to lock/unlock FTO Failure to open on demand LCP Leakage in closed position OTH Other PLU Plugged/ choked POW Insufficient power SER Minor in-service problems SET Failure to set/retrieve SPO Spurious operation STD Structural deficiency

Suggest a change

Opens a pre-filled GitHub issue on the COPI repo — nothing is sent until you submit it there.