Core Ontology for Petroleum Installations · INF-UFRGS-Ontologies · CNPq INF-UFRGS-ENERGIA inf.ufrgs.br/ontologies/copi dee69df

christmas tree

CFIHOS TagAndEquipmentClass

ID: CFIHOS-30000494

Faça login para ver esta definição.

Hierarchy

Broader / Parent

Properties / Attributes (134)
Name Data Type Unit / Valid values Required Definition
access port(s) between crown plugs (on HXT) Text — Optional Specify the porting into the area between the crown plugs for HXT.
annulus access valve Text — Optional The annulus access valve annulus access valve (AAV)) type.
annulus configuration Text — Optional The configuration of the annulus to define the annulus crossover intersection location, valves and sensor locations.
annulus gas lift service Boolean — Optional The gas lift function requirement.
annulus material trim Text — Optional The material trim requirements for the annulus.
annulus vent or wing valve size Text — Optional The nominal size of annulus vent valve (for Configuration #1) or annulus wing valve (for Configuration #2).
annulus vent valve Text — Optional The annulus vent valve (AVV) type.
chemical injection between annulus wing and master valve Text — Optional The chemical injection line between annulus wing and master valve (AWV/AMV) isolation requirement type.
chemical injection between PMV and PWV - Line #1 Text — Optional Select the chemical injection line between PMV and PWV - Line #1 isolation requirement type.
conformity assessment system level Text — Optional The Conformity Assessment System (CAS) class letter in accordance with IOGP specification and obligatory requirements.
connection load capacity Text pound-force Optional The connection load capacity of the downhole tubing.
cool down 'no touch time' Number minute Optional The required cool down 'no touch time'.
crossover piping production bore intersection location Text — Optional The location for the crossover flow loop to intersect the production (injection) bore.
design water depth Number metre Optional Specify the design water depth
downhole chemical injection (3/8 in. tubing) - Line #4 Text — Optional The isolation requirement type if the line is used or 'blanked' if the line is unused.
downhole chemical injection line isolation valve material trim option Text — Optional The material trim class for the downhole chemical injection line isolation valve.
downhole chemical injection line valve and porting upgraded to HH trim option Text — Optional Specify if the block porting and the isolation valve for one of the downhole lines is required to be upgraded to HH trim.
downhole electric and fiber optic line selection Text — Optional The downhole electric and fiber optic line selection.
drift diameter Number millimetre Optional The production tubing drift diameter.
drift diameter of landing string Number millimetre Optional The minimum drift diameter of the landing string to allow specification of appropriately-sized HXT crown plugs or VXT TH plugs.
dry weight Number kilogram Optional A weight of an object excluding any operating or process fluids.
erosion condition monitoring Boolean — Optional Specify if flowline erosion condition monitoring is required.
flowing wellhead temperature Number degree celsius Optional The flowing wellhead temperature.
flowline connection location Text — Optional The flowline connection location.
flowline connection type Text — Optional The flowline connection type.
flowline leak detection Boolean — Optional Specify if flowline leak detection is required.
flowline sand detector Boolean — Optional Specify if flowline sand detection is required.
gas lift choke Boolean — Optional Specify if a gas lift choke is required.
gas lift choke configuration and retrieval method Text — Optional The gas lift choke/insert configuration and retrieval method.
gas lift choke operation Text — Optional The gas lift choke operation type.
gas lift flow meter Boolean — Optional Specify if a gas lift flow meter is required.
gas lift flow meter retrieval method Text — Optional The gas lift flow meter retrieval method.
gas lift isolation valve Text — Optional Select subsea tree valve and actuator gas lift isolation type options.
insulation required Boolean — Optional Specify if insulation is required or not.
line size of chemical injection Line #1 Text — Optional The line size for the chemical injection Line #1.
location of additional 1 in tubing chemical injection line Text — Optional The location for the single additional 1 in. (25 mm) OD tubing chemical injection line option.
material grade Text — Optional The material grade of the downhole tubing.
metering for chemical injection between PMV and PWV - Line #1 Boolean — Optional Specify if metering for chemical injection between PMV and PWV - Line #1 is required.
metering for chemical injection between PWV and PCV - Line #2 Boolean — Optional Specify if metering for chemical injection between PWV and PCV - Line #2 is required.
metering for chemical injection between PWV and PCV - Line #3 Boolean — Optional Specify if metering for chemical injection between PWV and PCV - Line #3 is required.
metering for chemical injection outboard of PCV - Line #4 Boolean — Optional Specify if metering for chemical injection outboard of PCV - Line #4 is required.
metering for downhole chemical injection - Line #1 Boolean — Optional Specify if metering for downhole chemical injection - Line #1 is required.
metering for downhole chemical injection - Line #2 Boolean — Optional Specify if metering for downhole chemical injection - Line #2 is required.
metering for downhole chemical injection - Line #3 Boolean — Optional Specify if metering for downhole chemical injection - Line #3 is required.
metering for downhole chemical injection - Line #4 Boolean — Optional Specify if metering for downhole chemical injection - Line #4 is required.
minimum temperature for cool down 'no touch time' Number TEMP Optional The minimum temperature that must be maintained during the specified 'no touch time'.
minimum TRL for components, equipment, and assemblies Text — Optional The minimum TRL for components, equipment and assemblies.
minimum vertical access bore through tree and tubing hanger Number millimetre Optional The minimum vertical access bore diameter through the x-mas tree and tubing hanger.
monogramming of underwater safety valves Boolean — Optional Specify if the USVs are to be monogrammed per API.
normal operating pressure Number PRESS Optional A pressure at which a functional or physical object is expected to operate normally.
number of downhole hydraulic lines Number piece Optional The total number of downhole hydraulic lines required (including chemical injection, hydraulic surface-controlled subsurface safety valves (SCSSV) and hydraulic IWC lines in total).
number of hydraulic lines for each hydraulic SCSSV Number COUNT Optional The number of downhole hydraulic lines required for each hydraulic surface-controlled subsurface safety valves (SCSSV).
number of SCSSVs Number piece Optional The total number of surface-controlled subsurface safety valves (SCSSV) (hydraulic and electric).
outside diameter Number millimetre Optional A diameter that is across the outside cross section of a circular object.
pig detection Boolean — Optional Specify if flowline pig detection is required.
pressure-containing tree cap locking method Text — Optional The method for locking the pressure-containing tree cap to the tree mandrel.
production (injection) choke configuration and retrieval method Text — Optional The production (injection) choke mounting and retrieval configuration.
production (injection) choke operation Text — Optional The choke operation type.
production (injection) choke step size/profile Text — Optional The choke step size and profile details.
production (injection) choke valve flow coefficient of velocity Text — Optional The tree-mounted production (injection) choke valve flow coefficient.
production (injection) flow meter Text — Optional The type of flow meter required on the production (injection) bore.
production (injection) flow meter retrieval method Text — Optional The production (injection) flow meter retrieval method.
production isolation valve type Text — Optional The production isolation valve (PIV) type.
production valve size Text — Optional The nominal size of the production (injection) bore and valves.
rated current for electric SCSSV Number ampere Optional The electric power requirements of each electric surface-controlled subsurface safety valves (SCSSV) in amps.
rated voltage for electric SCSSV Number volt Optional The electric power requirements of each electric surface-controlled subsurface safety valves (SCSSV) in volts.
seabed hydrates expected Boolean — Optional Select whether seabed hydrates are expected.
sensor element type for annulus bore between annulus master and wing valve Text — Optional The sensor element type for annulus bore between annulus master and wing valve (AMV/AWV).
sensor element type for annulus bore inboard of annulus master valve Text — Optional The sensor element type for annulus bore inboard of annulus master valve (AMV).
sensor element type for annulus bore outboard of annulus wing valve Text — Optional The sensor element type for annulus bore outboard of AWV.
sensor element type for production bore between PMV and PWV Text — Optional The sensor element type for production bore between PMV and PWV.
sensor element type for production bore downstream of PCV Text — Optional The sensor element type for production bore downstream of PCV.
service and assembly product specification level Text — Optional The product specification level (PSL) requirement based on the service type.
snag load protection Boolean — Optional Specify if snag load protection is required.
subsea tree temperature class Text — Optional The subsea tree API temperature class.
through-bore drill-bit size for drift capability (for HXT or THS only) Text — Optional The through-bore drill-bit size for drift capability (for HXT or tubing head spool (THS) only).
tubing hanger bottom connection details for downhole electric/fiber optic line(s) Text — Optional The connection details (connector type and preparation) for downhole electric and fiber optic connections to bottom of tubing hanger.
tubing hanger bottom tubing connection for SCSSV line(s) Text — Optional The connection details (connector type and preparation) for surface-controlled subsurface safety valves (SCSSV) hydraulic connection(s) to the bottom of the tubing hanger (TH).
tubing hanger bottom tubing connection type for downhole hydraulic and chemical injection lines Text — Optional The connection details (connector type and prep) for the downhole tubing connections to the bottom of the tubing hanger.
tubing hanger orientation Text — Optional The method or source of tubing hanger rotational orientation.
tubing hanger pup joint / saver sub bore Number millimetre Optional The TH pup joint / saver sub bore.
tubing hanger pup joint / saver sub connection type Text — Optional The TH pup joint / saver sub connection type.
tubing hanger pup joint / saver sub length Number millimetre Optional The TH pup joint / saver sub length.
tubing hanger pup joint / saver sub outer diameter Number millimetre Optional The TH pup joint / saver sub outer diameter.
type of connection Text — Optional The connection type of the downhole tubing.
type of subsea tree Text — Optional The type of subsea tree.
underwater safety valve designations Text — Optional The valves to be designated as underwater safety valve (USV). If 'other' is selected, Specify the valve(s) to be designated as USV(s) in the 'Additional notes' column.
upper limit design pressure Number bar Optional The highest pressure at which a functional or physical object is designed for.
upper limit operating pressure Number bar Optional A pressure which is the highest pressure at which a functional or physical object is expected to operate.
valve isolation chemical injection between PWV and PCV - Line #2 Text — Optional The line isolation requirement type between production wing valve (PWV and pressure control valve (PCV).
valve isolation chemical injection between PWV and PCV - Line #3 Text — Optional The line isolation requirement type between production wing valve (PWV) and pressure control valve (PCV).
valve isolation chemical injection outboard of PCV - Line #4 Text — Optional The line isolation requirement type (pressure control valve (PCV)).
valve isolation downhole chemical injection (3/8 in. tubing) - Line #1 Text — Optional The isolation requirement type if the line is used or 'line not present or port blanked' if the line is unused.
valve isolation downhole chemical injection (3/8 in. tubing) - Line #2 Text — Optional The isolation requirement type if the line is used or 'line not present or blanked' if the line is unused.
valve isolation downhole chemical injection (3/8 in. tubing) - Line #3 Text — Optional The isolation requirement type if the line is used or 'line not present or port blanked' if the line is unused.
valve ROV override type Text — Optional The valve ROV override type.
VXT – swab valves (PSV and ASV) Text — Optional The vertical christmas tree (VXT) swab valves type. Pressure safety valve (PSV) and anti-surge valve (ASV).
VXT other tubing plug model Text — Optional The VXT tubing plug or other plug model.
VXT other tubing plug pressure rating Number bar Optional The VXT tubing plug or other plug pressure rating.
VXT other tubing plug size Text — Optional The VXT tubing plug or other plug size.
VXT other tubing plug type Text — Optional The VXT tubing plug or other plug type.
VXT pressure-containing tree cap configuration Text — Optional The production and annulus bores isolation.
VXT tree cap pressure-containing seals Text — Optional The type of sealing (metal-to-metal or non-metallic) to be used for pressure-containing seals of the VXT tree cap.
VXT tubing hanger annulus bore plug model Text — Optional The VXT TH annulus bore plug model.
VXT tubing hanger annulus bore plug pressure rating Number bar Optional The VXT TH annulus bore plug pressure rating.
VXT tubing hanger annulus bore plug size Text — Optional The VXT TH annulus bore plug size.
VXT tubing hanger annulus bore plug type Text — Optional The VXT TH annulus bore plug type.
VXT tubing hanger external A annulus seals Text — Optional The type of sealing (metal-to-metal or non-metallic) to be used for VXT tubing hanger external A annulus seals.
VXT tubing hanger production bore plug model Text — Optional The VXT TH production bore plug model.
VXT tubing hanger production bore plug pressure rating Number bar Optional The VXT TH production bore plug pressure rating.
VXT tubing hanger production bore plug size Text — Optional The VXT TH production bore plug size.
VXT tubing hanger production bore plug type Text — Optional The VXT TH production bore plug type.
wellhead connector hydrate prevention and inhibition Boolean — Optional Select whether wellhead connector hydrate prevention and inhibition are required.
wellhead connector/mandrel type Text — Optional The mandrel and wellhead connector type.
wellhead gasket retention mechanism requirement Text — Optional The components on which wellhead gasket retention mechanisms are required.
wellhead isolation-sleeve sealing location Text — Optional The lower seal sealing location of the wellhead isolation-sleeve.
asphaltenes Boolean — Optional Specify if asphaltenes is present or not.
flow rate capability for THAID with less than 1 in² flow-by area Number cubic metre per day Optional The flow rate capability for THAID with less than 1 in² flow-by area considering maximum required gas lift, well kill and circulation.
HXT lower crown plug model Text — Optional The lower crown plug model.
HXT lower crown plug pressure rating Number bar Optional The lower crown plug pressure rating.
HXT lower crown plug size Text — Optional The lower crown plug size.
HXT lower crown plug type Text — Optional The lower crown plug type.
HXT upper crown plug model Text — Optional The upper crown plug model.
HXT upper crown plug pressure rating Number bar Optional The upper crown plug pressure rating.
HXT upper crown plug size Text — Optional The upper crown plug size.
HXT upper crown plug type Text — Optional The upper crown plug type.
hydrate formation Boolean — Optional Specify if hydration formation occurred or not.
mudline suspension system Boolean — Optional Define whether a mudline suspension system exists or not.
number of connection Number COUNT Optional Number of lines connected to the equipment
piggable Boolean — Optional Specify if piggable or not.
sand production Boolean — Optional Specify if sand produced or not.
scale formation Boolean — Optional Specify if scale formation occurred or not.
tubing hanger rotational torque resistance capacity Text — Optional The required rotational torque resistance capacity of the tubing hanger.
wax formation Boolean — Optional Specify if wax formation occurred or not.

Suggest a change

Opens a pre-filled GitHub issue on the COPI repo — nothing is sent until you submit it there.