Definition & axiom
⚠ Conflicts with the ISO 15926-4 primary definition
Label (EN)
electrical switch
Label (PT-BR)
Definition (EN)
Definition (PT-BR)
Semi-formal axiom (Aristotelian)
Axiom type
Validation status
Why primitive (necessary only)
Reviewer notes
FOL theory & disjointness
First-order logic theory (generated)
Loading…
Disjoint with
▸
Expert review
Axiomatization steps
1
Identity-Giving Function
✓ done
⚠ not anchored
ElectricalSwitchingFunction → ElectricalSwitchingProcess
▼
COPI-Core operation
⚠ Process parent
PlannedProcess reaches no COPI-Core operation, and no gap (out of scope / coverage gap) is recorded.
LLM rationale:
CFIHOS and ISO 15926 give the same functional definition — 'turns electrical current on and/or off' — with no structural constraint, so the function is identity-giving and sufficient.
▸
Expert review
2
Genus Proximus
✓ done
MaterialArtifact
▼
Genus (genus proximum)
Most specific superclass — may be a domain class like "Valve" or an IOF-Core root.
BFO/IOF-Core Root
bfo:Object branch
bfo:ObjectAggregate branch
bfo:ImmaterialEntity branch
LLM rationale:
ISO 15926 types it as an ARTEFACT and a SWITCHING DEVICE; MaterialArtifact is the corresponding IOF root.
▸
Expert review
3
Differentia Specifica
✓ done
∃bearerOf.ElectricalSwitchingFunction
▼
Conditions that distinguish
Electrical Switch
from sibling classes under genus
MaterialArtifact.
Only what is not already entailed by the genus.
Differentia expression
Differentia (natural language)
LLM rationale:
Purely functional basis, stated identically by two independent standards, so equivalence is safe.
▸
Expert review
4
Necessary Parts
✓ done
no necessary parts
▼
Consider part-whole relations beyond subsumption:
hasComponentPartAtAllTimes (universal, structurally essential)
· hasComponentPartAtSomeTime (contingent, optional component)
LLM rationale:
No sub-component is named in any source definition for this term. validate_necessary_parts_quotes() requires a verbatim source_quote for every part, and there is nothing to quote — so no parts are asserted (ODR-022 §10.2).
▸
Expert review
5
Process Participation Signature ⟨I, O, T⟩
✓ done
ControlSignal → InformationContentEntity
▼
Inputs (I)
Outputs (O)
Transformation (T)
LLM rationale:
Energy is not a participant (ODR-010 §5.1): the switch's electrical demand is a quality (bearer_of ElectricalCurrent), while the process participants are the command and the resulting state.
▸
Expert review
More
Alternative labels
none
▼
Synonyms / alternative labels (comma-separated) — skos:altLabel
Language auto-detected on export (PT if the label contains accents, EN otherwise).
Properties as BFO qualities
0 of 16 selected
▼
Select which CFIHOS/DEXPI properties inhere in every instance of Electrical Switch as
bfo:Quality subclasses.
Each selected property →
:ElectricalSwitchQuality ⊑ bfo:Quality, inheres in :ElectricalSwitch
Custom axioms
none
▼
Axioms not produced by the pipeline. Each is appended verbatim as an
rdfs:subClassOf restriction on Electrical Switch.
Write the restriction block in Turtle syntax (without the leading
rdfs:subClassOf).
Example: [ owl:onProperty :hasPart ; owl:someValuesFrom :Wellhead ]
Cross-standard divergences
none detected yet
▼
Click "Detect divergences" to analyse cross-standard disagreements for this cluster.